Topic Archives: Projects

Support Tally Ho

Jul 30, 2018, 6:42 PM
In this episode, Leo gets some more help to remove a lot of Tally Ho’s hull planking. The volunteers grind and hammer copper rivets, while he finishes lofting the intermediate frames inside the workshop. Finally he makes the first frame template, and cut the first futtocks for that frame, shaping the Live Oak timber using the huge ship/bandsaw, a large circular saw, and the custom sawzall assembly.
Jul 18, 2018, 7:28 PM
In this episode, Leo has a number of interesting volunteers and visitors, who help him out with various aspects of the project – a welding machine, a sign for the shed, some much-needed modifications to the massive ship-saw, a forklift service, and a ride in a classic muscle car. Meanwhile, he continues lofting inside the shed, and we are nearly ready to start re-framing!
Jul 2, 2018, 3:06 PM
In this episode, Leo continues lofting the lines of the 1910 Gaff Cutter, Tally Ho – enlarging them to life-size on the new 50’ lofting floor in the workshop. He gets some help from a young Australian Shipwright, and has another very special surprise visitor!