Topic Archives: Projects

Support Tally Ho

Jun 23, 2019, 7:36 PM
…in which they finish the templates for the bow assembly and cut out all the pieces with the chainsaw jig. Meanwhile, Leo has to deal with a damage to a power-plane, the Shipsaw, a chainsaw, part of his camera, and his wallet! Jack and Joe lose their minds organising all the fastenings in the workshop, and Leo gets to do a bit of amateur furniture-making with a mirror-stand for Cecca. We plane everything in sight, and eat our lunch on a very expensive boutique purpleheart table.
Jun 10, 2019, 7:03 PM
After a holiday on a beautiful yacht in Turkey, Cecca and Leo head back to the US, where Tally Ho is waiting. Leo gets two new volunteers, Joe and Jack, who start off by making Frame Templates for the bow. In preparation for the new Bow Assembly, we cut the old Frame Heels and Hood End Fastenings, spring out the planks and frames in the bow, and remove the old Stem and Forefoot.