Topic Archives: Projects

Support Tally Ho

Jul 20, 2019, 6:03 PM
A worrying thunder-shake in the new stem means Leo has to make and install a large graving piece. After making some wedges and cutting notches in the scarph joints, we assemble the Stem, Knee, Forefoot and Mast Step in the bow of Tally Ho… lifting the gigantic stem overhead with the forklift is quite an amazing sight! After a tiny bit of trimming we drill and counterbore the holes for the bolts, and then cover everything (including ourselves, of course) with a thick layer of tar before putting it together for the final time and bolting it up - the centreline is complete!
Jul 9, 2019, 9:37 AM
In this episode we finally dry fit the purpleheart bow assembly timbers. In other news, we come up with a short-term solution to a damaged Babbitt bearing in the Ship-saw, and we remove Tally Ho’s Transom. We say goodbye to Jack and Joe, but meet two new volunteers, Renaud and Rowan. The chicks are growing up and Leo nearly drops a big timber on his head.