Episode 27 - From Lofting to Re-Framing / Removing Planks
Jul 28, 2018 5lkxzxThis episode, I get some more help to remove a lot of Tally Ho’s hull planking. The volunteers grind and hammer copper rivets, while I finish lofting the intermediate frames inside the workshop. Finally I make the first frame template, and cut the first futtocks for that frame, shaping the Live Oak timber using the huge ship/bandsaw, a large circular saw, and the custom sawzall assembly.
To become a Patron - https://www.patreon.com/sampsonboatco
To donate or support - http://sampsonboat.co.uk/support
Music:
- Dan Lebowitz - Mysteries
- Bad Snacks - The Morning After
- John Deley and the 41 Players - Sour Tennessee Red
- E’s Jammy Jams - The Cascades
- Bad Snacks - Easy Sunday
Topics
Related Posts
Loading Conversation