This episode, I drive the 3000 miles back to Tally Ho from South Georgia, where Steve Cross has been milling Live Oak for me. I bed and bolt the 6’ Scarph in the new keel timber, and the Live Oak flitches arrive by flatbed. Then we create a framework inside to boat to spread the load of the props while I remove the Keel Timber from underneath it, all the while hoping that nothing breaks and that the boat doesn’t deform at all in shape or crush me underneath it!

To become a Patron - https://www.patreon.com/sampsonboatco

To donate or support - http://sampsonboat.co.uk/support

Music:

  • Heftone Banjo Orchestra - Guatemala - Panama March
  • The Underscore Orkestra - Swing Gitane
  • Los Sundayers - Mi Verdad
  • US Army Blues - Kellis Number
  • Giorgio di Campo - Ragtime Diner

Loading Conversation