In this episode we hang the last of the regular planks and start making “shutter planks” - the planks that fill a gap between already fastened areas of planking above and below. These require more careful patterning, but are extremely satisfying to hammer into place if they fit properly - but will they ?

Before we hang the very final plank (the Whisky Plank!) I trim the plank ends flush with the transom, which really visually transforms the boat. Finally the Whisky plank is hammered into place, and the crew celebrates with a well earned wee dram.

To become a Patron - https://www.patreon.com/sampsonboatco

To donate or support - http://sampsonboat.co.uk/support

Music:


Loading Conversation