Jan 5, 2019, 11:36 AM
This episode, I start by installing and running a new helical cutter-head in the planer thicknesser, before making a pair of oak frames with the help of some volunteers, and notching those…
Jan 26, 2019, 11:40 AM
This episode, after a little work on the frames, Cecca and I take a trip to Vancouver for my VISA interview at the US consulate. When we get back to the USA Cecca has to head back home to the UK, but…
Feb 9, 2019, 11:43 AM
This episode, while the team keeps on building new frames, I make the templates for the Stern part of the Centerline, from the lofting floor. The ShipSaw gets some love and affection, and the framing…
Feb 23, 2019, 11:46 AM
The yard is full of deep snow, but we have no time to spare! Finn and I cut out all the remaining Stern Assembly pieces from the huge Purpleheart timbers, and then use power-planes, hand-planes,…
Mar 9, 2019, 11:49 AM
With the deadline of the “Frame-raising party" looming, the race is on to try and get the Stern Assembly into the boat! With a strong team now, we are able to lift most of the pieces by hand, but have…
Mar 23, 2019, 11:53 AM
Before the rest of the volunteers arrive, we have to get the huge timbers of the Stern Assembly bedded and fastened into the stern of Tally Ho. First we drill the holes for the bolts, using a 6’ long…
Apr 7, 2019, 11:57 AM
After weeks of hectic preparation, we begin the big push to re-frame the stern of Tally Ho! For these 3 weeks, we have 10 people (including myself) working full-time on the boat; Kirt (USA), Finn…
Apr 27, 2019, 12:00 PM
Now we enter the final week of intensive Frame Production, with the team of volunteers going at full swing to finish reframing the entire stern of TALLY HO before our deadline. Spirits are high, and…
May 18, 2019, 12:04 PM
This episode is a little different from usual – it is part of my recent presentation about the Tally Ho project at the Royal Ocean Racing Club in London. In this part of the talk I explore Tally Ho’s…
May 25, 2019, 12:07 PM
This week we continue with the 2nd part of the Royal Ocean Racing Club presentation. This part of the talk focuses more on my own story before I began working on Tally Ho – from spending my late teens…
Jun 8, 2019, 1:59 PM
After a holiday on a beautiful aluminium yacht in Turkey, Cecca and I head back to the US, where Tally Ho is waiting. I get two new volunteers, Joe and Jack, who start off by making Frame Templates…
Jun 22, 2019, 2:02 PM
Cutting the Bow timbers! … in which we finish the templates for the bow assembly and cut out all the pieces with the chainsaw jig. Meanwhile, I have to deal with a damage to a power-plane, the…
Jul 6, 2019, 2:05 PM
In this episode we finally dry fit the purpleheart bow assembly timbers. In other news, we come up with a short-term solution to a damaged Babbitt bearing in the Ship-saw, and we remove Tally Ho’s…
Jul 20, 2019, 2:08 PM
A worrying thunder-shake in the new stem means I have to make and install a large graving piece. After making some wedges and cutting notches in the scarph joints, we assemble the Stem, Knee, Forefoot…
Aug 3, 2019, 2:11 PM
Having installed the new Stem, it’s time to replace all the frames in the bow of the boat! Eight awesome volunteers show up and we get straight to work, training them to build double-sawn Live Oak…
Aug 17, 2019, 2:14 PM
In this episode we follow the life of a single Futtock, from being marked on a template to being installed as a finished frame. Frame-raising 2.0 is going well, with more than half of the last section…
Sep 7, 2019, 2:17 PM
Tally Ho is fully re-framed! In this episode we see the final part of the frame-raising party, as we make and install the last of the frames that make up the bow of the boat. We also work on the…
Sep 21, 2019, 2:20 PM
After the busyness of the Frame-raising, it’s just me and the boat again for a while. I have some tough decisions to make as I look into ordering the timber for the deck-structure and planks. After a…
Oct 6, 2019, 2:23 PM
In this episode, I cut the rest of the shape of the Cutwater into the Stem, using a chainsaw. Then I plane it smooth, and shape the transition to the square stem-head with a grinder. I also take a…
Oct 19, 2019, 2:25 PM
In this episode, I ask the question “is Tally Ho still the same boat?” ...I explore the ancient philosophical question of The Ship of Theseus, and how that problem applies to this project and also to…
Nov 2, 2019, 2:28 PM
In this episode, after roughing-out the starboard side Rabbet into the Stem, I make a jig to transfer the measurements for the shape of the Keel Timber from the lofting floor to the boat itself. Then…
Nov 16, 2019, 2:31 PM
Rowan returns to give me a hand, and we finish shaping the keel with Adze and power-plane. Then we carve some shape into the Stern Assembly, roughing out the Stern-post with a chainsaw first, before…
Dec 1, 2019, 2:33 PM
In this episode we install the Fashion Pieces, which will form the connection between the hull planking and the transom. We have to cut the heels, drill and chisel the notches in the centreline, and…
Dec 21, 2019, 2:36 PM
In this episode I start by adjusting the position of some of the frames, and fairing them all on the inside. Then I cut and fit the scarph joins on the big 6-1/2” x 3” Angelique timbers. Along the…

Loading Conversation